초록· 키워드

오류제보하기
A comprehensive construction company that receives orders for construction works is being constructed by subcontracting to a discontinued company when finishing work for civil engineering, beauty, and furniture. In addition, design details are often changed during the finishing construction phase due to reduced construction costs and design changes depending on the site situation before sub-contractor work. This leads to frequent meetings among finishing construction officials, wasting time and manpower to change drawings. As a way to prevent such problems in advance, architectural design is being carried out by applying BIM processes that virtually model facilities from planning, designing, engineering (structure, equipment, electricity, etc.) to construction, maintenance, and disposal of multi-dimensional virtual space, and the Public Procurement Service and the Ministry of Land, Infrastructure and Transport are recommending mandatory for activating BIM. The BIM has many studies in the construction industry that have been combined with the fourth industrial technology to improve such problems as the delay of the schedule of subsequent processes due to construction errors, and the increase in construction costs. I would like to propose a system using existing BIM and fourth industrial technology as a way to utilize it in the closing construction stage. In this study, the theory and prior study of 3D Scanning, the fourth industrial technology, and the applicable support system at the finishing stage were reviewed in this study, and based on this, the process of XR cooperation system for finishing construction at the construction stage was established. Based on trends in current use of BIM and 3D Scanning, 3D Scanning technology can be used to convert 3D information collected at the site into BIM data and extract comparative data in conjunction with existing BIM data to detect errors related to site dimensions and construction location of the process prior to the finishing work, as well as to change the design of walls, columns, floors, furniture, etc. In addition, after converting all data into XR data, construction simulation can be checked in conjunction with XR equipment. The 3D Scanning data converted to BIM data is a system that can modify and check actual construction information such as design change and changed materials, quantity, and dimensions in advance through the system, and we want to grasp the construction status stage information and suggest a scenario for smooth communication among finishing construction workers.

목차

ABSTRACT
1. 서론
2. 이론 및 선행연구 고찰
3. 3D Scanning을 활용한 마감공사단계 XR 협업시스템 가이드라인 제시
4. 3D Scanning을 활용한 마감공사 단계 XR 협업시스템 시나리오
5. 결론
References

참고문헌 (12)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2020-530-001160002